Technical Appendix 2-1 Construction Environmental Management Plan (CEMP)

Technical Appendix 2-3 Projects Considered in the Cumulative Assessment

Technical Appendix 3-2 First Residents Letter

Technical Appendix 3-4 Minutes of Meeting with Mayo County Council on 16.01.2025

Technical Appendix 3-6 Minutes of Meeting with NPWS

Technical Appendix 3-8 Log of Non-Substantive Statutory and Non-statutory Scoping Responses

Technical Appendix 5-1 Technical Habitat Report

Technical Appendix 5-3 Bat Survey Report_Part1

Technical Appendix 2-2 Forestry Report

Technical Appendix 3-1 Proposed Muingmore Wind Farm Brochure

Technical Appendix 3-3 Scoping Report

Technical Appendix 3-5 Meeting Records with An Coimisiún Pleanála

Technical Appendix 3-7 Community Consultation Report

Technical Appendix 4-1 Battery Safety Management Plan

Technical Appendix 5-2 Bird survey report

Technical Appendix 5-3 Bat Survey Report_Part2

Technical Appendix 5-3 Bat Survey Report_Part3

Technical Appendix 5-3 Bat Survey Report_Part4

Technical Appendix 5-4 Triturus Ltd Aquatic Baseline & Fisheries Assessment_Part1

Technical Appendix 5-5 Peatland Restoration Plan (PRP) & Habitat Management Plan (HMP)_Part1

Technical Appendix 5-4 Triturus Ltd Aquatic Baseline & Fisheries Assessment_Part2

Technical Appendix 5-5 Peatland Restoration Plan (PRP) & Habitat Management Plan (HMP)_Part2

Technical Appendix 5-6 Habitat Condition Assessment Report

Technical Appendix 5-7 Marsh Fritillary Survey Report

Technical Appendix 5-8 Avian Collision Risk Model Report

Technical Appendix 6-1 GI Factual Report_Part1

Technical Appendix 6-1 GI Factual Report_Part2

Technical Appendix 6-2 Peat Landslide and Hazard Risk Assessment

Technical Appendix 6-3 Peat Management Plan

Technical Appendix 7-1 EU Directives, National Legislation and Regulations, Guidelines,Technical Standards

Technical Appendix 7-2 Site Visit Details

Technical Appendix 7-3 TDR and Cable Route

Technical Appendix 7-4 Water Framework Directive

Technical Appendix 7-5 Surface Water Laboratory Results

Technical Appendix 7-6   Rating of Existing Environmental Significance, Sensitivity (IGI, 2013 Guidelines)

Technical Appendix 7-7   Description of Effects (EPA, 2022)

Technical Appendix 7-8   Classification of the Significance of Effects (EPA, 2022)

Technical Appendix 9-1 Glossary of Terms

Technical Appendix 9-2 Copy of 2025 Wind Energy Ireland Position Paper on AM Conditions

Technical Appendix 9-3 Baseline Noise Survey Details

Technical Appendix 9-4 Alternative Turbine Calculations

Technical Appendix 9-5 Background Noise Survey Measurement Data

Technical Appendix 9-6 Grid Connection Route (GCR) Construction Noise Levels

Technical Appendix 9-7 Operational Wind Turbine Noise Assessment Graphs

Technical Appendix 10-1 View Point Assessment

Technical Appendix 10-2 LVIA Mapping

Technical Appendix 11-1 Shadow Flicker Modelling Input Data

Technical Appendix 11-2 Shadow Flicker Scenario 1 Shutdown Times by Turbine

Technical Appendix 11-3 Shadow Flicker Scenario 2 Shutdown Times by Turbine

Technical Appendix 11-4 Shadow Flicker Scenario 3 Shutdown Times by Turbine

Technical Appendix 12-1 Cultural Heritage Gazetteer

Technical Appendix 13-2 Aviation Review Statement

Technical Appendix 14-1 Abnormal Indivisible Load Route Survey

Technical Appendix 14-2 Muingmore TII Scoping Response

Technical Appendix 13-1 Air Corps Wind Farm-Tall Structures Position Paper

Technical Appendix 13-3 Telecommunications Impact Study

Technical Appendix 14-3 Traffic Flow Survey Report

Technical Appendix 14-4 Construction Traffic Management Plan (CTMP)