Technical Appendix 2-1 Construction Environmental Management Plan (CEMP)
Technical Appendix 2-2 Forestry Report
Technical Appendix 2-3 Projects Considered in the Cumulative Assessment
Technical Appendix 3-1 Proposed Muingmore Wind Farm Brochure
Technical Appendix 3-2 First Residents Letter
Technical Appendix 3-3 Scoping Report
Technical Appendix 3-4 Minutes of Meeting with Mayo County Council on 16.01.2025
Technical Appendix 3-5 Meeting Records with An Coimisiún Pleanála
Technical Appendix 3-6 Minutes of Meeting with NPWS
Technical Appendix 3-8 Log of Non-Substantive Statutory and Non-statutory Scoping Responses
Technical Appendix 6-1 GI Factual Report_Part1
Technical Appendix 3-7 Community Consultation Report
Technical Appendix 4-1 Battery Safety Management Plan
Technical Appendix 6-1 GI Factual Report_Part2
Technical Appendix 6-2 Peat Landslide and Hazard Risk Assessment
Technical Appendix 6-3 Peat Management Plan
Technical Appendix 7-1 EU Directives, National Legislation and Regulations, Guidelines,Technical Standards
Technical Appendix 7-2 Site Visit Details
Technical Appendix 7-3 TDR and Cable Route
Technical Appendix 7-4 Water Framework Directive
Technical Appendix 7-7 Description of Effects (EPA, 2022)
Technical Appendix 9-1 Glossary of Terms
Technical Appendix 7-8 Classification of the Significance of Effects (EPA, 2022)
Technical Appendix 9-2 Copy of 2025 Wind Energy Ireland Position Paper on AM Conditions
Technical Appendix 9-3 Baseline Noise Survey Details
Technical Appendix 9-4 Alternative Turbine Calculations
Technical Appendix 9-5 Background Noise Survey Measurement Data
Technical Appendix 9-6 Grid Connection Route (GCR) Construction Noise Levels
Technical Appendix 9-7 Operational Wind Turbine Noise Assessment Graphs
Technical Appendix 10-1 View Point Assessment
Technical Appendix 10-2 LVIA Mapping
Technical Appendix 11-1 Shadow Flicker Modelling Input Data
Technical Appendix 11-2 Shadow Flicker Scenario 1 Shutdown Times by Turbine
Technical Appendix 11-3 Shadow Flicker Scenario 3 Shutdown Times by Turbine
Technical Appendix 12-1 Cultural Heritage Gazetteer
Technical Appendix 13-1 Air Corps Wind Farm-Tall Structures Position Paper
Technical Appendix 14-1 Abnormal Indivisible Load Route Survey_Part2
Technical Appendix 14-1 Abnormal Indivisible Load Route Survey_Part3
Technical Appendix 14-2 Muingmore TII Scoping Response
Technical Appendix 14-3 Traffic Flow Survey Report
Technical Appendix 14-4 Construction Traffic Management Plan (CTMP)